Quality is the basic requirement of man today when we talk about any field of life. Here I will discuss the four points that can be used by a person who wants a quality pavement either he know about the functionality of asphalt or not. After reading the information shared you will be able to check the quality of your work and ask about the quality of your work from driveway paving contractors you hire for your asphalt paving work.
www.standardpavinginc.com

Table of contents

  • What is the asphalt finisher used for finishing with pavement?
  • The quality control method of asphalt construction
    • Pull flooring test to check the failure of the roadbed
    • Check the amount of asphalt without core
    • Check compaction degree of roadbed in field density test
    • Flatness test checks road flatness
  • Summary

What is the asphalt finisher used for finishing with pavement?

The asphalt finisher uses a heavy machine that performs the pallet construction of the base layer and the surface layer which is the final process of asphalt pavement work.

As a structure, it is divided into a tractor section equipped with a self-propelled function, a hopper filled with heated asphalt mixture, and a screed which presses out the asphalt mixture on the paved surface and disposes of it.

The asphalt mixture that has been carried in the dump truck is first stored in the hopper, and if it can fill the amount necessary for construction, it sends it to the screen with a roller and spreads the putty on the road so that it is filled with a spatula.

By adjusting the angle and width of the screen, it is also possible to adjust the thickness and width of the asphalt mixture on the ground.

As a rule, asphalt must be finished while it is still hot, in most cases, you will see a sight that the road rollers and tire rollers follow the asphalt finisher and rolling down from the desired side it becomes.

The quality control method of asphalt construction

Strict quality control standards are established for asphalt pavement which is supposed to be used for many years.

Since the asphalt mixture is a “paste”, there are various factors that determine the quality, such as the temperature during mixing, the degree of mixing, and whether the pressure reduction is secure.

At the same time, there is also difficult to judge simply by looking at the pavement from the outward appearance. Therefore, it is possible to do a test to check the quality during construction of the asphalt pavement and after construction, and to pass it through to finalize it.

In the following section, I will explain four kinds of quality check tests mainly used for asphalt pavement work.

Pull flooring test to check the failure of the roadbed

The pull flooring test is a test conducted before the asphalt mixture is laid, at the stage when the roadbed is exposed.

Pass out a loaded dump truck etc. on the crushed stone of the compacted roadbed and check whether there is any problem on the roadbed surface after passing through the track.

The examination is done by visual observation, and if you find a defective part on the roadbed surface, you need to take some remedial measures such as temporarily removing the material used in that part and replacing it with good quality material.

Check the amount of asphalt without core

Core removal is a test that is performed after the completion of spreading asphalt mixture and after drying is completed. Determinate points randomly on the finished paved surface, drill holes in the place and pull out a part of the asphalt mixture spread over the surface layer and base layer.

You can see from the sampled model whether the aggregate contained in the mixture meets the prescribed particle size, the asphalt at the bridge is how much the specified amount is used or how compacted by compaction. It is an important test to check the quality of the surface layer and the base layer which are exposed to the weathering and load most in the pavement.

Check compaction degree of roadbed in field density test

The density test is a quality test conducted after the roadbed finishes. Drill a hole in the compacted roadbed to recover a part of the roadbed material and fill the empty hole with sand. This is a construction method called sand substitution method, and we first reveal the volume according to how much sand entered.

Consider the recovered roadbed material and divide it by the volume that was clarified ahead of time to derive the density of the roadbed material by calculation. If the roadbed is tightly compacted, it should satisfy the prescribed density, so it is the dimension that you can check the compaction condition of the road by measuring the density.

The degree of compaction is directly linked to the load carrying capacity of the roadbed, and if the compaction is insufficient, there is a danger that the paved surface can withstand the weight of the car traveling above it.

Flatness test checks road flatness

The flatness test is a test carried out after the finish of the surface asphalt mixture is completed. Use a flatness measuring instrument such as a wheelbarrow called 3 ⅿ profile meter and check whether the pavement surface is flattened neatly.

If the pavement surface is not flat, rainwater may accumulate in unintended places and become a puddle, or it may become a problem to the person passing over.

Summary

The main points of the process of asphalt pavement construction are summarized below.

  1. What is the asphalt finisher used for finishing with the pavement,
  2. Four pilot tests are mainly used for quality control of pavement work, and each element to be measured is different.

By grasping what kind of work is necessary to fully demonstrate the characteristics, you may be able to smoothly arrange meetings when asking the asphalt paving contractor for yourself.

I am pleased if the knowledge introduced this time will be useful to everyone.

0 Thoughts to “Four Pilot Tests Used for Quality Control of Asphalt Pavement Work”

  1. Asphalt Paving

    […] from asphalt paving companies near you then you can check their working and performance here are four pilot tests used for quality control of asphalt pavement work. Also, read “How the winter season could affect asphalt?” if you are living in the area where […]